Building Better Pothole Repairs with Recycled Asphalt and Mastic Surfacing

Click Here To Enlarge This Photo Of Building Better Pothole Repairs with Recycled Asphalt and Mastic Surfacing

How Asphalt Reheating & Recycling Plant Equipment Can Strengthen Existing Mastic Repair Programmes 

Across the UK, local authorities are under increasing pressure to deliver longer-lasting road repairs while making every maintenance budget work harder.

Many councils have adopted mastic asphalt as a durable wearing course for permanent pothole repairs, helping to protect repairs from water ingress and extend carriageway life. 

However, every permanent repair is only as strong as the foundation beneath it. 

Rather than replacing existing mastic repair methods, Greener Asphalt's Asphalt Reheating & Recycling Plant Equipment is designed to complement them. By recycling removed asphalt into fresh hot asphalt for the structural base layer before applying the final mastic surface, councils can improve durability, reduce purchased material costs and make better use of reclaimed asphalt already available on site. 

Looking Beyond the Surface Layer 

Before mastic can be applied, deep excavations need rebuilding with a suitable structural base. Traditionally, this has meant purchasing and transporting cold asphalt to pack out the repair before sealing it with mastic. 

At the same time, valuable breakout material removed from the carriageway is often transported away. 

This raises an important question: Could that material be recycled and reused instead? 

Greener Asphalt's Asphalt Reheating & Recycling Plant Equipment allows removed breakout and planings to be recycled directly on site into fresh hot asphalt, creating a durable structural foundation before the final mastic wearing course is applied. 

The repair process remains familiar, but the material strategy becomes significantly more efficient. 

The Benefits for Local Authorities 

Using recycled hot asphalt as the base layer alongside existing mastic repair programmes offers several practical advantages: 

  • Lower material costs by reducing the need to purchase cold asphalt.
  • Produce fresh hot asphalt on demand, eliminating reliance on deliveries and minimum order quantities.
  • Recycle valuable breakout material instead of transporting it away as waste.
  • Reduce transport movements and improve operational efficiency.
  • Create a stronger structural base beneath the final mastic surface.
  • Support longer-lasting permanent repairs while making better use of maintenance budgets.

Rather than changing how repairs are completed, this approach enhances the process councils are already using. 


A Practical Partner to Existing Mastic Repairs 
One of the biggest advantages of using our machinery is its ability to integrate seamlessly into established maintenance programmes. 

The workflow becomes straightforward:

  1. Remove the failed asphalt.
  2. Recycle the breakout using Greener Asphalt's
  3. Asphalt Reheating & Recycling Plant Equipment.
  4. Produce fresh hot asphalt on demand.
  5. Reinstate the structural base layer.
  6. Apply the final mastic asphalt wearing course. 

By strengthening the repair from the ground up, authorities can continue benefiting from the durability of mastic while making better use of existing materials and reducing reliance on imported products.

 

Back To List

Cookies

This website uses cookies. Please let us know if you agree to the use of these cookies :
I Accept I Decline

Privacy Policy | 3rd Party Data Processors | Disable Cookies
Cookies